2023 Projects

Design Work Proposed for 2023 Construction

Coon Rapids Blvd (CSAH 1) at Mississippi Blvd - Signal Replacement

Anoka County, in partnership with the City of Coon Rapids, is developing a preliminary layout for replacing and updating the existing signal system at CSAH 1 (Coon Rapids Blvd) at Mississippi Boulevard, with anticipated construction in 2023.

Old Central Avenue NE (CSAH 35) and Gardena Avenue

Anoka County, in partnership with the City of Fridley, is developing a preliminary layout for the construction of a roundabout at the intersection of Old Central Avenue NE (CSAH 35) at Gardena Ave N.E.

Ramsey Gateway Project

Anoka County, MnDOT, and the City of Ramsey developed a locally supported vision of the Highway 10 corridor through Ramsey as part of the Ramsey Gateway Highway 10 Study. The Ramsey Gateway Highway 10 Project continues that vision with design of two grade-separated interchanges at Ramsey Boulevard and Sunfish Lake Boulevard that will replace existing signalized intersections. Grade separation of the BNSF Railway and a new frontage road between Ramsey Boulevard and Sunfish Lake Boulevard are also part of this design project.

Viking Boulevard (CSAH 22) Bridge Repair/Rehabilitation

Anoka County, in partnership with the City of Oak Grove, is developing plans for the replacement and/or rehabilitation of the bridge on CSAH 22 (Viking Boulevard) over the Rum River. 


Round Lake Blvd (CSAH 9) and 221st Avenue - Intersection Improvements


Armstrong Boulevard (CSAH 83) and Alpine Drive - Roundabout Construction